The manipulator automatically picks up the material and puts it into the fixture, which is stable and efficient
The action flow of the automatic shell-inserting and dispensing machine: turn on the power switch--press the start button--the vibrating plate automatically feeds the material to the guide rail distribution--the left and right return fixtures start feeding--the photoelectric switch detects the material--manipulator 1 Clamp the material to --Y-axis fixture 1-- After fixture 1 is filled with material—move to the 2nd position of the glue filling manipulator to start the glue filling--manipulator 1 and then clamp the material into--Y-axis fixture 2- Repeated work from left to right - manually remove the full tray, and so on.
Automatic Dispensing for Sensors
L1500*W1150*H1450M
M
3000~3600PCS/H
PLC, touch screen control
The manipulator automatically picks up the material and puts it into the fixture, which is stable and efficient
4 dispensing heads can automatically dispense glue and pour glue, and the amount of glue is accurate
Factory Pictures
![]() | ![]() |
![]() | ![]() |
1、Founded in 2004, focusing on the production of automation equipment for 18 years, it has gathered technical talents in the industry, and all key positions have technical personnel with more than 15 years of industry experience, ingenious craftsmanship, quality assurance

2、12 senior design engineers, all with more than 10 years of work experience, free for you to customize personalized solutions.
3、With 6 sets of precision carving machine processing equipment, quadratic element, CNC processing equipment, visual tester and other testing equipment to ensure product quality
FAQ
Our services
Our machines will be vacuum packed and packed in export-reinforced inspection-free wooden boxes to avoid machine damage, moisture and rust during transportation.
After the electrical parts of the hardware processing parts are complete, our assemblers will assemble the machine,
our electrical engineers will conduct power distribution, write and instill the machine program, and then debug and
run. This cycle is 5-7 working days.
1. Customers provide samples and design solutions
The design plan requires you to provide detailed product size, product process flow, incoming materials, quality requirements, equipment production efficiency, etc. Engineers make plans, evaluate equipment feasibility, cost, and production efficiency, complete machine schematics, partial schematics, action descriptions, and equipment technical parameter descriptions. We will hand over the preliminary plan to you for evaluation.

2. Confirm the plan and sign the technical agreement
The company organizes engineers and technicians to discuss the plan with you via video. Our engineers will refine the plan and determine the final plan. At the same time, we will provide a written sub-item quotation. After reaching an agreement, we will sign the relevant technical agreement and purchase and sales contract.

3. Design drawings, audit drawings
We will arrange engineers to design the mechanism, make machine assembly drawings and parts drawings, and the company audit team will review the designed drawings to check whether the machine structure is reasonable and whether it meets your needs, etc. After the review, the final drawings will be printed. And issued to the relevant departments, 7-10 working days

4. Procurement of electrical parts, processing of structural hardware
The purchasing department purchases equipment and electrical accessories according to the engineering drawing model, and the machining department processes the hardware structural parts according to the drawings issued by the project. The specific processing technology includes milling machine, CNC numerical control, lathe, quenching, grinding machine, wire cutting, pressing spark, etc., 7-10 working days

5. Program writing, assembly and debugging
After the electrical parts of the hardware processing parts are complete, our assemblers will assemble the machine, our electrical engineers will conduct power distribution, write and instill the machine program, and then debug and run. This cycle is 5-7 working days.

6. Quality inspection
After the machine debugging is completed, we will have a quality inspection team to check the quality of the machine. Send you a video of the stable operation of the equipment, and follow your online video acceptance to meet your quality requirements.

7.Packaging and shipping
Our machines will be vacuum packed and packed in export-reinforced inspection-free wooden boxes to avoid machine damage, moisture and rust during transportation.

8. After-sale service
After you receive the goods, we will arrange special after-sales personnel to connect with you according to your needs, and arrange 1-to-1 technical support from engineers, conduct operation and technical training, etc., to ensure the stable and safe operation of the equipment

PRODUCTS
CONTACT US
Contact Person: Mr.Dane Lu
Mobile And WhatsApp: +86-136 8687 1913
Email Address: sales01@szcjrmachine.com
Address: Building 16, Longwang Temple Industrial Park, Baishixia Community, Fuyong Street, Baoan District, Shenzhen City, Guangdong province, China.